Dartford Crossing tunnel closure, Digimart Global (United Kingdom): One of the tunnels at the Dartford Crossing on the M25 has been closed after a defect was found during overnight works, causing delays of about 90 minutes for motorists.
National Highways said the defect was discovered during overnight work on the east bore, meaning the tunnel could not reopen at 05:00 GMT as scheduled. The east bore will stay closed until repairs have been carried out, with specialist repair crews due to attend on Monday morning.
The closure has caused heavy congestion on the approach, with approximately eight miles of queuing on the anticlockwise carriageway and traffic backing up to junction four for Orpington. Traffic information service Inrix said hour-long delays were also affecting the A2 London-bound at the Darenth Interchange, with queues stretching back to the M2 at Gravesend.
Drivers of taller vehicles face extra restrictions. A height limit at the west bore means any vehicle taller than 4.8m (15ft 9in) must use an alternative route or wait for the tunnel to reopen.
Separately, delays have been reported on the anticlockwise M25 in Surrey between junctions 13 for Staines and 12 for Chertsey after a lorry fire. National Highways said three of the five lanes in that area were closed, with delays reaching back to junction 14 for Heathrow.














