M25 Dartford tunnel delays, Digimart Global (United Kingdom): Drivers face delays of about 90 minutes on the M25 after one of the tunnels at the Dartford Crossing was closed following the discovery of a defect during overnight works.
National Highways said the fault was found during overnight works, which meant the east bore could not reopen at 05:00 GMT as scheduled. The east bore will stay closed until repairs have been carried out, with specialist repair crews due to attend on Monday morning.
Congestion on the approach is severe, with roughly eight miles of queuing on the anticlockwise carriageway, stretching back to junction four for Orpington. Traffic on the A2 London-bound at the Darenth Interchange is also facing hour-long delays, with Inrix reporting queues stretching back to the M2 at Gravesend.
A height restriction applies at the west bore of the tunnel, meaning vehicles taller than 4.8m (15ft 9in) must use an alternative route or wait for the tunnel to reopen.
Separately, delays are affecting the anticlockwise M25 in Surrey between junctions 13 for Staines and 12 for Chertsey after a lorry fire. National Highways said three of the five lanes in the area had been closed, with delays stretching back to junction 14 for Heathrow.














